检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]山东电力工程咨询院有限公司,山东济南250013
出 处:《山东大学学报(工学版)》2011年第3期167-172,共6页Journal of Shandong University(Engineering Science)
摘 要:根据两层规划理论,提出网络约束机组组合的二层优化模型和算法。上层是以各子系统总成本最小为目标,考虑网络约束的有功优化潮流;下层由若干无网络约束的发电子系统构成,子系统由上层决定其发电任务,以此为依据决策机组的启、停状态。两层问题依据下层各子系统提供的边际信息交替求解,当边际信息无变化时便完成了机组组合。算例分析表明该方法对解决网络制约的机组启、停决策问题是有效的。A bi-level decision-making method for the network-constrained unit commitment(UC) problem was proposed.The upper level with the objective to minimize the total cost of subsystems solves the optimal power flow problems including network constraints and determines the generations of subsystems in the lower level.A subsystem is composed of generators in one system without network constraints and minimizes its generation cost to give the units states.The two levels are solved alternatively according to the marginal information of the lower level.Two study cases were analyzed to exhibit the effectiveness of the method presented.
分 类 号:TM732[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229