摘 要:以淮南1 000 kV变电站为例,提出了一种特高压变电站初期主接线的研究方法。以连续性、安全性、充裕度等指标为主要观测点,对3种备选主接线方案的可靠性进行定性分析和定量计算。通过比较各方案的可扩展性及全寿命周期成本,最终推荐四角形接线为初期1 000 kV主接线最优方案。This paper introduces a research method for main electrical connection of ultra-high voltage substation at initial stage.Taking 1000kV Huainan substation as an example,the qualitative analysis and quantitative calculation of reliability of three alternative electrical connection schemes are performed according to such main parameters as continuity,security and ampleness.The extensibilities and life cycle costs of these schemes are compared and quadrangle-connection is recommended as the best electrical connection for Huainan substation.
分 类 号:TM645[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28