检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]四川大学,四川成都610065 [2]四川省电力工业局,四川成都610061 [3]四川省农水局,四川成都610017
出 处:《四川水力发电》1999年第4期77-80,83,共5页Sichuan Hydropower
摘 要:结合国家重点工程天生桥一级水电站施工试验,分析了面板堆石坝坝体堆石料采料爆破的块度控制。重点研究了料和料现场试验和施工过程,满足设计堆石料块度级配要求的爆破参数调整。根据施工现场的特点,提出了采用修正后的KUZ-RAM模型作为预报合理块度相应的采料爆破参数的数模.通过编程计算,达到在现场实时控制堆石料级配的目的。Based on expsrience from construction of the Tianshengqiao I hydropower station (key project in China), size control after rock blasting for rockfill material of concrete-face rockfill dam with is studied. In-situ test and construction procedure for IIIA material and IIIB material and blasting parameters which meet the requirements of gradation for design rockfillmaterial size are mainly studied. According to in site construction features, a revised KUZ-RAM model is used as parametricmodel for predicting appropriate size of rock blasted. By programming and calculating, real time control of rock fill gradationin site is realized.
分 类 号:TV4[水利工程—水工结构工程] TV542
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28