汾河二库枢纽大坝帷幕灌浆及其效果分析  

Curtain Grouting under Dam of Fenhe Reservoir Ⅱ And Its Effect Analysis

在线阅读下载全文

作  者:郑如义[1] 李志洁[2] 

机构地区:[1]水利部山西水利水电勘测设计研究院 [2]山西省汾河二库建设总指挥部

出  处:《山西水利科技》1999年第4期28-29,共2页Shanxi Hydrotechnics

摘  要:汾河二库大坝坝基节理发育,断层、破碎带多,岩溶较为发育。大坝帷幕灌浆主要采用小口径钻孔,孔口封闭,自上而下分段施工,孔内循环的灌浆方案,钻孔保证孔向准确,偏差不超过规范规定的值,在灌浆之前进行钻孔冲洗和压水试验,灌浆自上而下分段进行,每段5m ,浆液由稀至浓。检查钻孔压水试验及单位耗灰量分析,灌浆达到设计要求。The scheme of curtain grouting under dam of Fenhe Reservoir Ⅱ is such a scheme that holing in small diameter,closing in hole mouth,and stage descending grouting from top to bottom.In this paper,the design of curtain and construction of curtain grouting,and the analysis of the effect of the curtain grouting by water pressure test,the calculation of the grout consumption and drainage in foundation pit are introduced.The analysis result shows that the curtain grouting of Fenhe Reservoir Ⅱ is of good quality.

关 键 词:帷幕灌浆 钻孔冲洗 压水试验 效果分析 大坝 

分 类 号:TV543.58[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象