建设项目环境影响评价中污染物排放总量控制评价方法  被引量:1

Study on Assessment Method for Total Quantity Control of Pollutant Discharge in Construction Project's EIA

在线阅读下载全文

作  者:孙旭红[1] 张海燕[1] 张潞[1] 李寅年 蔡文彬[2] 谢华生[2] 陈子林[2] 

机构地区:[1]天津市环境影响评价中心,天津300191 [2]天津市环境保护局,天津300191

出  处:《城市环境与城市生态》1999年第6期54-56,共3页Urban Environment & Urban Ecology

基  金:1998 年天津市环境保护科研课题!编号9806

摘  要:本文提出了在建设项目环境影响评价中关于污染物排放总量控制评价所应包含的内容,介绍了清洁生产纳入环评中的方法,确定了在技术经济合理、污染物排放满足环境质量与排放标准前提下的排放总量,并对其合理性论证方法做了介绍,提出总量控制目标实现的对策。The assessment content for total quantity control of pollutants discharge in EIA is put forward in the study.The method of combining cleaner production with EIA is introduced and total discharge quantity under the conditions of technical and economic reasonableness and pollutants discharge amount meeting standards of discharge and environmental quantity are also determined here.Finally the method of rationality demonstration and countermeasure of achieving total quantity control target are provided in this article.

关 键 词:污染物排放总量 建设项目 环境影响评价 

分 类 号:X828[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象