检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《铁道建筑技术》2011年第6期24-27,共4页Railway Construction Technology
摘 要:基于几何控制的基本原理,以苏通长江公路大桥为研究对象,根据全过程自适应施工控制方法的具体特点和要求,就特大跨度斜拉桥施工控制体系进行了系统的研究。在考虑施工全过程几何非线性影响条件下,就施工控制体系中的全过程仿真分析、参数敏感性分析、参数识别和最优控制进行了阐述。通过在苏通大桥施工控制实施表明:本系统可以作为大跨度和超大跨度斜拉桥施工控制的一般方法。Based on the Geometry Control theory,taking Sutong Bridge as subject,systematic study are carried out on the construction control system of super-span cable-stayed bridge according to the specific characteristics and requirements of whole-procedure adaptive construction control.Taking the geometry non-linear effect during construction into account,the simulation analysis,parameter sensitivity analysis,parameter identification and optimal control of construction control system are explained.The validity of the proposed system is demonstrated by the construction control of Sutong Bridge,which shows the system can be used as a common method for large span and super span cable-stayed bridge.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.181.138