龙首二级水电站厂房基础抗震设计及工程措施  

Aseismic Design and Engineering Measures of Powerhouse Foundation for Longshou Ⅱ Hydropower Station

在线阅读下载全文

作  者:熊焰[1] 

机构地区:[1]甘肃省水利水电勘测设计研究院,甘肃兰州730000

出  处:《水电能源科学》2011年第7期74-76,141,共4页Water Resources and Power

摘  要:针对黑河龙首二级水电站发电厂房基础为活断层且断层破碎带宽度较大、又地处强震区等问题,根据现行规范要求,采用ANSYS构建了厂房基础的三维有限元静动力模型,获得了厂房基础各工况的抗震计算结果,论证了厂房基础的抗震稳定性,并基于计算分析结果提出了相应的工程措施以确保厂房的安全运行。The powerhouse foundation of Longshou Ⅱ hydropower station in Heihe River has characteristics of active fault with large width of fracture zone and is in strong seismic region. According to the existing design specification, ANSYS is used to establish three-dimensional finite elements static and dynamic model of powerhouse foundation. Then the aseismic calculation results of powerhouse foundation are obtained under different conditions. At the same time, it demonstrates aseismic stability of the powerhouse foundation. Finally, the corresponding engineering measures are put forward to guarantee safety operation of powerhouse.

关 键 词:厂房基础 活断层 强震区 抗震 蠕变 龙首二级水电站 

分 类 号:TV31[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象