检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团北京勘测设计研究院,北京100024
出 处:《水力发电》2011年第6期13-16,共4页Water Power
摘 要:天花板水电站调压井所处部位为镶嵌碎裂结构的岩屑石英砂岩夹粉砂质泥质页岩,不利于大直径洞室开挖。经分析研究将调压井断面直径27 m优化为23 m,开挖直径由31 m减至26.6 m,降低了开挖施工难度,节省了工程投资,确保了施工安全。电站甩负荷试验获得成功。The surrounding rock of surge tank in Tianhuaban Hydropower Station is fraetured mosaic structured lithie quartz sandstone mixed with silty clay shale, and is not conducive to large-diameter shaft excavation. After studying, the diameter of surge shaft is decreased to 23 m from 27 m, and the excavated section diameter is decreased to 26.6 m from 31 m. The optimization reduces the excavation difficulty, saves the investments, and ensures the construction safety. The load rejeelion tests show that the design of surge shaft is successful.
分 类 号:TV732.51[水利工程—水利水电工程] TV742
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117