机构地区:[1]武警水电第二总队八支队,福建厦门361009
出 处:《施工技术(下半月)》2011年第6期65-66,72,共3页Construction Technology
摘 要:由于天气和施工工序的原因,黄河班多水电站泄洪槽要过水泄洪,而在大型弧形钢闸门永久启升设备安装不到位,现场大型起重设备无法进场的情况下,用卷扬机配合滑轮组启升闸门。介绍了具体提升方案和相关计算、设备选择、吊耳设计及具体提升施工工艺。实践证明,该方法在交通条件差、施工环境恶劣的情况下较实用。In Banduo Hydropower Station,the tank needs to discharge because of the weather and construction process.But the permanent open-lifting equipment has not been completed.Under the condition of large-scale crane can't enter,the arc gate is lifted with hoists compounding with pulley blocks.Critical construction scheme,calculation,equipments selection,lug design and critical lifting technology are introduced.It proves that the mentioned method is applicable in poor traffic condition and construction environment.
关 键 词:水电站 大型弧形钢闸门 吊耳 起重设备 受力分析
分 类 号:TV547.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15