检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]鹤岗市国土资源局,黑龙江鹤岗154100 [2]中国建筑材料工业地质勘查中心黑龙江总队,黑龙江哈尔滨150040
出 处:《测绘与空间地理信息》2011年第3期219-221,共3页Geomatics & Spatial Information Technology
摘 要:在交通、房产、规划、拨地等测量工作中,由于施工控制网误差、放样误差、施工误差等综合影响,导致了放样、施工后地块的实际尺寸和设计数据的差异。文章分析了这些差异即误差的一般规律,讨论了依据设计数据所计算的实际地块面积精度的估算方法,以房产面积的测算和精度估算为例,说明研究结果的具体运用。During the process of transportation,housing and planning survey,the construction control network error,lofting error and construction lofting error can result in the data differences between the actual size and design plots after the construction lofting.This paper analyzed the general descipline of these errors,discussed the design data calculated according to the actual land area and the method of estimating the precision of the housing area,and finally explained the specific appliction of the research result by taking the measurement and accuracy estimate of house property's area as an example.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117