检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:马国强[1] 段宏江[1] 刘国峰[1] 王化恒[1]
机构地区:[1]中国水电顾问集团西北勘测设计研究院,西安710065
出 处:《西北水电》2011年第3期69-72,共4页Northwest Hydropower
摘 要:乌弄龙水电站在汛期时具有一定的泥沙含量,为有效地减少机组停机时导叶漏水量,减轻导水机构的空蚀和泥沙磨损,提高机组运行可靠性和灵活性,水轮机设置了筒形阀。文章就水轮机设置筒形阀后进水口快速闸门的设置、机组防飞逸措施、筒形阀液压系统的设置、厂房尺寸的调整等问题进行了深入探讨,可供其它工程参考。The Wunonglong hydropower station has certain silt content in flood period.Cylinder valves are provided for turbines so as to reduce the water leakage in guide vane during shutdown of units,decrease cavitation and sand abrasion of distributors,and increase the operation reliability and flexibility of units.This paper deeply discusses the issues resulted from provision of cylinder valves and in respects of intake emergency gate installation,the anti-runaway measures of units,the provision of hydraulic system for cylinder valves,and the adjustment of powerhouse size,etc.,which can provide reference for the other projects.
分 类 号:TV734.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15