凤凰山银矿中厚破碎矿体采矿方案改进  被引量:4

Mining Scheme Improved in Medium Thick and Broken Orebody of Fenghuanshan Silver Mine

在线阅读下载全文

作  者:谢火明[1] 阳雨平[1] 任建平[1] 邓良[1] 吴广宇[1] 

机构地区:[1]中南大学资源与安全工程学院

出  处:《现代矿业》2011年第6期13-15,共3页Modern Mining

摘  要:以凤凰山银矿为背景,分析了现采矿方案存在的问题,提出了急倾斜中厚矿体在围岩不稳定的条件下,沿走向布置回采进路的无底柱分段崩落法。优化了采场的结构参数,保证了出矿进路靠近下盘布置,增加了崩落矿石的流动范围,减少了下盘残留,提高了矿石回收率。The existing problems of the mining scheme in Fenghuangshan silver mine were analysis.Sublevel caving of the arrangement of mining entrance along the run of the ore vein has been offered when the steeply inclined medium thick orebody was under the instability of the surrounding rock mass.The structure parameter in the stope was optimized.The entrance of ore removal is enabled to be close to footwall arrangement,and the scope of the flow of ore is made greater.Footwall residual amount is reduced and the ore recovery is raised.

关 键 词:破碎不稳固矿体 倾斜中厚矿脉 分段崩落法 

分 类 号:TD863[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象