基于预应力锚索支护的马路坪矿采场稳定性分析  被引量:2

Stability Analysis of Stope in Maluping Mine Based on the Prestressed Anchor Supporting

在线阅读下载全文

作  者:郑尚松 栗红玉[2] 郭子源[2] 彭康[2] 贺锋坚[2] 廖九波[2] 刘志祥[2] 

机构地区:[1]贵州开磷集团矿业总公司 [2]中南大学资源与安全工程学院

出  处:《现代矿业》2011年第6期16-17,共2页Modern Mining

基  金:国家自然科学基金和上海宝钢集团公司联合资助项目(编号:51074177)

摘  要:开磷集团马路坪矿采用分段空场法嗣后充填法开采,为确保矿区在施工期及运营期的安全性,对采场顶板中部部位采用预应力锚索加固支护。通过采场支护前后的位移与变形特征、最大主应力分布特征、塑性区分布特征对比分析结果,分析了采场的稳定性,验证了支护方式的科学性。The Maluping mine of Kailin Group takes the sublevel field subsequent filling method to mine ore,and it can ensure the security of the mining area during the construction and operation.Maluping mine employ supporting anchoring in the central part of the stope roof.The displacement and deformation characteristics of supporting the stope before and after、 the maximum principal stress distribution and the distribution characteristics of plastic zone were analyzed and the analysis of the stability of stope were carried out,then we demonstrate the scientific support patterns.

关 键 词:预应力锚索 采场稳定性 数值模拟 

分 类 号:TD353[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象