作 者:杨勇 栗红玉[2] 彭康[2] 范文录[2] 赵井清[2] 戴兵[2]
机构地区:[1]北京中色鑫盛国际投资管理有限公司 [2]中南大学资源与安全工程学院
出 处:《现代矿业》2011年第6期26-28,共3页Modern Mining
摘 要:以地下开采锚固工程中使用较为普遍的7φ15.24 mm锚束为原型,在贵州开磷马路坪中深部(+640^+700 m中段)的采场进行现场试验,进行了多根普通预应力锚索的拉拔破坏试验,得到了每根岩锚的荷载变位曲线、失效破坏模式和锚固段长度、锚索网度、岩石强度等各种因素对预应力锚索锚固性能的对比分析结论,为马路坪矿井下支护工程提供了可靠的试验依据。Anchoring through the use of underground mining,which is more common 715.24 mm anchor beam as the prototype,Multiple ordinary prestressed cable pullout failure test was conducted in deep(+640 ~ +700 m the middle) of the Maluping mining field test site.Comparative analysis findings of Each rock bolt load deflection curve,failure mode and failure of anchorage length、cable network rock strength and other factors on the performance were obtained.It provides a reliable experimental basis of Underground Support Project for Maluping mine.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3