出 处:《沈阳工业大学学报(社会科学版)》2011年第3期234-237,共4页Journal of Shenyang University of Technology(Social Sciences)
基 金:沈阳市政府软科学基金项目(1091199-5-00)
摘 要:索赔是承包商和业主之间承担风险比例的合理再分配,多交叉事件干扰引起的索赔是工期索赔中的难点问题,共同责任分摊成为双方争论的焦点。针对多主体、多事件交叉干扰下的工期索赔责任归属难以判断和责任比例难以预测的问题,运用多人合作博弈的思想,基于Shapley值的工期延误分析法,首先通过Shapley值将延期责任分摊到各个活动,然后根据干扰事件的起因将延期责任在业主和承包商之间进行分摊,最后通过修正系数对延期责任进行再分摊。Claim is a reasonable re-distribution of the risk ratio between the contractor and the owner.For the difficulty of claim caused by multi-event intersected interference during project delayed claim,the allotment of common responsibility becomes the focus of dispute.Considering the difficulty of estimating responsibility ascription and assessing responsibility proportion of project delayed claim in multi-subject and multi-event intersected interference,the thoughts of collaborative game is applied,and the analytical method of project delay based on Shapley value is utilized.The project delayed responsibility is allotted to each single activity by Shapley value firstly,and is allotted between the owner and the contractor according to the origin of interference event secondly,and is re-allotted through correction factors at last.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145