雷达装备战场抢修支援分队调度决策研究  被引量:1

Research on Scheduling Decision for BDAR Supporting Unit of Radar Equipment

在线阅读下载全文

作  者:刘飞[1] 杨江平[1] 王晗中[1] 

机构地区:[1]空军雷达学院陆基预警监视装备系,湖北武汉430019

出  处:《军械工程学院学报》2011年第3期16-19,23,共5页Journal of Ordnance Engineering College

摘  要:针对雷达装备战场抢修支援分队支援抢修多个现场的损伤雷达装备,以及抢修过程中可能出现其它现场损伤雷达装备请求支援抢修的调度问题,以实现每次支援抢修损伤雷达装备都获得最大的战斗力恢复率为目标,提出了一种类似于计算机中断过程的调度决策方法。调度决策中的抢修中断优先级判定方法,也可作为抢修支援分队确定支援抢修多个现场损伤雷达装备初始次序的依据。最后,通过实例应用验证了调度决策方法的实用性和可行性。Aimed at the scheduling problem of the Battlefield Damage Assessment and Repair(BDAR)Supporting Unit repairing the damaged radar equipment in multi-battlefield locales,and being called for support by some other locales during the process,a scheduling decision method similar to the interrupt procedure in computer technology is proposed in this paper.The decision criterion is the maximum fighting power recovery rate after each supporting repair to the damaged radar equipment.Furthermore,the repair interrupt priority determining method can also be the criterion for the BDAR Supporting Unit deciding on the initial support order of damage radar equipment in multi-battlefield locales.Finally,the decision method is proved useful and feasible by an application example.

关 键 词:动态战场 调度策略 中断过程 

分 类 号:E92[军事—军事装备学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象