列控系统室内集成测试流程及方法的探讨  被引量:1

Discussion on Procedures and Methods of Laboratory Integration Test of Train Control System

在线阅读下载全文

作  者:刘长波[1] 

机构地区:[1]北京全路通信信号研究设计院有限公司,北京100073

出  处:《铁路通信信号工程技术》2011年第3期9-14,共6页Railway Signalling & Communication Engineering

摘  要:结合客运专线列控系统的科研开发和工程应用,以武广客运专线为例,对列控系统室内集成测试的流程、内容及方法进行探讨,通过C2/C3测试内容和方法的比照,提出了CTCS-3车地一体的SDT测试的优越性,SDT测试将会覆盖列控系统功能及全部工程配置数据。SDT测试已成功运用于武广工程,并证实了其有效性。Taking Wu-Guang DPL as an example, this paper discusses the procedures, contents and methods of laboratory integration test of train control system based on the development and application of train control systems for DPLs. It presents the advantages of the system delivery test (SDT) of the whole CTCS-3 train-wayside system by comparison of the contents and methods for CTCS-2/CTCS-3 test. The SDT covers the test of train control system functions and all engineering confi guration data. It has been successfully applied to Wu-Guang Project, and its effectiveness has been verifi ed.

关 键 词:列控系统 集成测试 流程 方法 武广客运专线 

分 类 号:U284.482[交通运输工程—交通信息工程及控制]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象