检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《中国工程科学》2011年第7期33-37,共5页Strategic Study of CAE
摘 要:三峡工程在设计、建设和运行过程中,对我国水利水电工程建设、机电设备制造和生态环境保护等各个领域提出了巨大的挑战。针对三峡工程建设的关键技术和难题,国内各个领域的专家学者,进行联合科研攻关,取得了一系列重大创新成果,提高了我国相关领域的科技水平。简要列举了三峡工程建设和运行过程中形成的主要创新成果,对我国今后重大水利水电工程建设和水电清洁能源开发具有重要意义。In the design, construction and operation periods of the Three Gorges Project (TGP), great challenges have been met in different fields such as water resources and hydropower project construction, electrome-chanical equipment manufacture and ecological environment protection. In view of the key techniques and difficulties in the construction period, S&T breakthrough have been performed by the experts and scholars of various fields and a series of innovative achievements are gained, which make the scientific and technological levels in relevant fields improved. Some major innovative achievements gained in the TGP construction and operation are enumerated, which are significant for the hydropower project construction and clean energy development in the future in China.
分 类 号:TV632[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.127