检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长江水利委员会长江勘测规划设计研究院,武汉430010
出 处:《中国工程科学》2011年第7期85-90,122,共7页Strategic Study of CAE
摘 要:简要介绍了三峡双线五级船闸的总体设计及总体布置,高水头船闸的输水技术,全衬砌船闸结构的关键技术问题,大型人字门及启闭设备和复杂运行条件下的监控技术。船闸自2003年投入运行,运行实践证明,设计采用的技术先进、合理、可靠。三峡船闸的设计建设,发展了船闸工程的设计理论和实践,使世界船闸工程技术达到了新水平。The general design and layout of the double-line five-step ship-lock , the water delivery tech-nique for high head ship-lock, the key technical problems of fully lined ship-lock and the monitoring techniques for large-scale miter gates and hoisting equipment under complicated operation conditions of the Three Gorges Project (TGP) are introduced. Since the operation of ship-lock in 2003, the operation practice has proved that the design techniques are advanced, rational and reliable. The design and construction of the fully lined ship-lock promotes the development of design theory and practice of ship-lock projects, which makes the construction technology of ship-lock in the world reach a new level.
分 类 号:TV61[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.221.185.110