三峡工程双线五级船闸设计  被引量:9

The design of double line five step ship lock of Three Gorges Project

在线阅读下载全文

作  者:钮新强 童迪 宋维邦 

机构地区:[1]长江水利委员会长江勘测规划设计研究院,武汉430010

出  处:《中国工程科学》2011年第7期85-90,122,共7页Strategic Study of CAE

摘  要:简要介绍了三峡双线五级船闸的总体设计及总体布置,高水头船闸的输水技术,全衬砌船闸结构的关键技术问题,大型人字门及启闭设备和复杂运行条件下的监控技术。船闸自2003年投入运行,运行实践证明,设计采用的技术先进、合理、可靠。三峡船闸的设计建设,发展了船闸工程的设计理论和实践,使世界船闸工程技术达到了新水平。The general design and layout of the double-line five-step ship-lock , the water delivery tech-nique for high head ship-lock, the key technical problems of fully lined ship-lock and the monitoring techniques for large-scale miter gates and hoisting equipment under complicated operation conditions of the Three Gorges Project (TGP) are introduced. Since the operation of ship-lock in 2003, the operation practice has proved that the design techniques are advanced, rational and reliable. The design and construction of the fully lined ship-lock promotes the development of design theory and practice of ship-lock projects, which makes the construction technology of ship-lock in the world reach a new level.

关 键 词:三峡工程 双线五级 船闸设计 

分 类 号:TV61[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象