山东电网开展±660kV直流输变电工程工作的探讨  

Discussion about Shandong Grid Carrying out the Work of ±660kV DC Transmission Project

在线阅读下载全文

作  者:刘民[1] 姚金霞[1] 牛新生[1] 徐志恒[1] 

机构地区:[1]山东电力研究院,山东济南250002

出  处:《山东电力技术》2011年第4期1-6,共6页Shandong Electric Power

摘  要:介绍了宁东—山东±660 kV直流输电工程的特点及目前国内直流输电工程开展情况。通过对国内直流输电工程的设备、系统调试、监督服务等方面的工作调研,针对我省的宁东—山东直流输电工程,提出了应该提前介入控制和保护系统功能联合测试、设备和站系统调试等工作的建议,并提出了应重点着手开展的直流输电对山东电网影响研究的相关课题和技术工作。The characteristics of Ningdong-Shandong ±660kV DC transmission project and the present executing situation of DC transmission project were introduced.Through investigation for the equipment,system debugging and monitoring services of domestic DC transmission project,a proposal that the joint test for the control and protection system capability and the work for equipment and station system debugging should be involved in ahead were proposed for the Ningdong-Shandong DC transmission project.Also,some issues and techniques about focusing on carrying out research on the impact of DC transmission on Shandong Power Grid was proposed.

关 键 词:直流输电 调试 监督服务 山东电网 影响 

分 类 号:TM711[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象