非同期并列对发电机绝缘造成的损坏及处理  被引量:1

Damage to the Generator Insulation Caused by Random Paralleling and Its Solution

在线阅读下载全文

作  者:亓玉福 王炳成[1] 

机构地区:[1]泰安供电公司,山东泰安271000

出  处:《大电机技术》2011年第4期45-47,共3页Large Electric Machine and Hydraulic Turbine

摘  要:某热电厂的3#发电机发生了非同期合闸,短路电流为6000A,定子绕组端部多根线棒位移达到10mm左右,固定绑扎绳多根断裂。进行常规的试验没有发现绝缘缺陷,当进行交流耐压试验时,定子绕组绝缘发生击穿。本文对发电机故障后的绝缘试验情况及绝缘击穿部位的查找进行了重点介绍。The #3 generator of a thermal power plant switched in unparallel.The short-circuits current was 6000A,the displacement of several winding bars at the bottom of the stator winding reached about 10mm,and several attached banding cords cracked.The insulation defect was not detected in the conventional test.When the alternating current breakdown test was carried out,the stator winding insulation broke down.In this paper,the insulation test after breakage and searching the location of the breakdown insulation are detailed.

关 键 词:发电机 非同期并列 绝缘损坏 处理 

分 类 号:TM305.2[电气工程—电机]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象