检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中国水电顾问集团成都勘测设计研究院,四川成都610072
出 处:《人民长江》2011年第14期42-45,63,共5页Yangtze River
摘 要:大岗山水电站坝区边坡具有高地应力、高地震烈度、卸荷风化强烈的显著特点。为确保缆机平台边坡安全,采用二维弹塑性有限元方法模拟左岸缆机平台PLⅢ-PLⅢ剖面边坡开挖施工过程,对开挖过程中的应力变形特征及稳定性进行计算分析,研究边坡在逐层开挖逐层支护过程中的应力变形演化规律、预应力锚索对边坡的加固支护效果以及对边坡稳定性的影响。计算结果表明,在预应力锚索的及时加固下,边坡均处于稳定状态。The slope of Dagangshan Hydropower Station is characterized by high geo-stress,high seismic intensity and strong unloading and weathering effect.For guaranteeing the slope safety at cable platform,we simulate the excavation process of PLIII-PLIII cross-section by 2D FEM,and obtain the stress-strain characters and stability of the slope.The stress-strain evolution law of slope under excavation-supporting alternation and supporting effect of pre-stress cable to slope stability are investigated.The results reveal that the slope is in safe status by reinforcement of pre-stress cable in time.
分 类 号:TV698[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.151