检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《科技信息》2011年第21期I0304-I0306,共3页Science & Technology Information
摘 要:进度计划是工程项目管理的基础,进度控制是项目管理工作中最核心、最富挑战的部分。本文通过项目管理中进度控制所取得的发展成就,针对项目管理中产生的进度控制问题,分析其被忽视以及影响进度的多层面因素,并以云南农村干部学院综合楼及云南农业大学田家炳楼工程项目为例,对进度控制的理论和方法提出一些认识和看法。Schedule plan is the basis of project management, and schedule control is the the most crucial and challenging part of the project management progress . Based on the achievement in the development of schedule control in project management, and in order to solve the schedule control problem in project management, this paper analyzes the influencing multidimensional factors that schedule control is neglected. Some viewpoints on the theories and methods of schedule control are summed up by take the building of Rural Institute of Yunnan and Yunnan Agricultural University, Tian Jia Bing Project as an examples.
分 类 号:TU722[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3