用Arena对B物流公司作业时间的仿真及优化  被引量:2

Time Optimization on B Logistics Company Based on Simulation with Arena

在线阅读下载全文

作  者:赵晶英[1] 马昌谱[2] 

机构地区:[1]广东石油化工学院机电工程学院,广东茂名525000 [2]桂林电子科技大学信息科技学院,广西桂林541004

出  处:《科技管理研究》2011年第15期121-124,共4页Science and Technology Management Research

基  金:国家自然科学基金资助项目(60903079)

摘  要:用Arena输入分析模块对记录所得数据进行分析处理,将结果用到仿真模型并实施运行,结合仿真运行结果及公司特点提出了作业时间优化方案。对比采取优化措施前后的仿真模型运行结果可以发现,工作人员的时间利用率提高11.37%,等待办理业务顾客的等待时间下降60.49%,提货顾客数、发货成功顾客数、发货不成功顾客数没有明显变化。The data obtained from records was analyzed with the input analyzer of Arena. The result was used into the simulation model and its operation. Working time optimization was brought forward combined with operation results and the company particulars. After comparing the optimized simulation model with the original one, we found that staff time utilization increased by 11.37fereent, and the waiting time for customers decreased by 60. 49 percent. However, there were no significant changes in the number of customers who pick up the goods, the number of successful delivery customer, and the number of unsuccessful delivery customer.

关 键 词:仿真 作业时间优化 物流公司 ARENA 

分 类 号:TP391.9[自动化与计算机技术—计算机应用技术]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象