检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Michael Peter Nicholas Burrow Gurmel S. Ghataora Harry Evdorides
机构地区:[1]School of Engineering, University of Birmingham, Birmingham, UK
出 处:《Journal of Civil Engineering and Architecture》2011年第3期224-232,共9页土木工程与建筑(英文版)
摘 要:There are a number of design procedures which have been developed to determine the appropriate thickness of trackbed layers on a railway track in order to reduce train induced stresses to an acceptable level thus ensuring that subgrade failure does not occur prematurely. This paper briefly describes four such procedures and compares the thickness of trackbed layers proposed by each for a number of hypothetical situations. To demonstrate further the suitability of each procedure, two existing sites in the UK are analysed and the trackbed layer thickness given by each procedure is then compared. The research shows that the procedures do not give consistent results. Subsequently it is suggested that it is important to consider other aspects in addition to the prescription of a suitable thickness of trackbed layers in any new build, renewal or remediation scheme.
关 键 词:Railways railway foundations track deterioration BALLAST subgrade.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15