检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]武汉通联路桥机械技术有限公司,武汉430050
出 处:《铁道标准设计》2011年第8期50-53,共4页Railway Standard Design
摘 要:对原高铁下行式移动模架进行了创新和优化,取消了原来2榀主框架间的4道柔性横联;而将前门架、中门架及后门架都设计成马鞍式刚性横联,使2榀主框架在横向刚性地联接成为一个整体;同时,在开模系统中引入了自动化活动配重。这样,使新型高铁下行式移动模架的结构形式更加紧凑合理,使用性能更加高效快捷。该模架在施工过程中,效果理想,得到了用户的广泛好评。另外,还重点介绍了自动化活动配重系统的设计理论和方法。Innovations and optimizations have been carried out for the original movable mould frame for high speed railways: four flexible lateral bracings were canceled, the forward frame, middle frame and rear frame were designed with saddle-type lateral bracings, so that two main rigid frames were connected transversely into a whole body; meanwhile, automatic movable weights were introduced into the mould opening system. As a result, the structure of the new type movable mould frame for high speed railways will be more compact and reasonable, the performance will be more efficient. The design theory and method for the automatic movable weight system are introduced in detail. The mould flame has been effectively adopted by many customers with good recognitions.
关 键 词:下行式移动模架 活动配重 横向刚性横联 双卷筒 设计
分 类 号:U445.463[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.21