厦门湖边大桥钢管拱安装施工技术  

Assembling Techniques for Hubian Steel-tube Arch Bridge in Xiamen City

在线阅读下载全文

作  者:闵拥军[1,2] 

机构地区:[1]西安理工大学,西安710048 [2]中铁一局集团有限公司,西安710043

出  处:《铁道标准设计》2011年第8期68-70,74,共4页Railway Standard Design

摘  要:介绍湖边大桥主桥采用的预应力混凝土下承式梁-单拱组合结构形式构造,由于主桥钢管拱设计是位于桥梁中线,且受引桥施工进度影响和周围环境限制,无法按照原设计方案将拱段运输至主梁中线上逐段拼装。经过方案优化,采用在桥面一侧翼缘板面上拼装、固定并与支架一体整体横向滑移至中线就位的施工工艺,采用此方法仅仅用5 d时间就顺利完成钢管拱横移就位;阐述主拱运输、起吊、拼装、固定、整体横移、就位的全过程。The paper introduces the type and construction of the Hubian pre-stressed concrete through girder-arch composite bridge. Since the steel-tube arch was designed on the center line of the bridge, which could not be transported to the center line and assembled by sections according to the original design due to the time limit of the construction of approaching bridge and also due to the environment. An optimized option was adopted to build the arch on one lateral flange of the bridge and to move it toward the center line together with the support frame. It took only 5 days to complete the process. The whole process including the transport, hoist, assembly, fixing on site, laterally moving of the arch is elaborated herewith.

关 键 词:公路桥 钢管拱桥 拼装 

分 类 号:U448.22[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象