利用悬浮式内摇臂抱杆分解组塔的施工工艺  被引量:3

Tower Construction Technics in Decompose Assembling with Suspension Internal Rocker Derrick

在线阅读下载全文

作  者:江全才[1] 叶翔[2] 黄成[1] 覃金彩[1] 钱颖[1] 

机构地区:[1]三峡大学电气与新能源学院,湖北宜昌443002 [2]三峡大学机械与材料学院,湖北宜昌443002

出  处:《南方电网技术》2011年第3期47-50,共4页Southern Power System Technology

摘  要:悬浮式内摇臂抱杆分解组塔能够在施工场地比较狭窄的山区组装施工,适合于特高压输电线路高塔组立。介绍了悬浮式内摇臂抱杆的设计方法、稳定措施及其分解组塔的施工工艺,包括现场布置、抱杆起立、塔腿组装、抱杆提升、塔身吊装、曲臂横担吊装和抱杆拆除。该施工技术在工程实践中取得了很好的效果。Tower construction in decompose assembling with suspension internal rocker derrick can be implemented in narrow fields of mountain areas,thus it is suitable for the constructure of high towers for UHV transmission lines.This paper introduces the design of suspension internal rocker derrick,measures to steady derrick and tower construction technics in decompose assembling,including the arrangement of job location,derrick uprise,installation of the tower bottom,derrick erection,tower body lifting,rocker crossarm lifting and derrick backout.The construction technics work well in engineering practices.

关 键 词:悬浮式 内摇臂抱杆 分解组装 

分 类 号:TM754[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象