检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:袁世伦[1]
机构地区:[1]铜陵有色金属集团控股有限公司,安徽铜陵244000
出 处:《中国矿山工程》2011年第4期9-12,共4页China Mine Engineering
基 金:国家"十五"科技攻关课题(2004BA615A-04)
摘 要:在实验室试验结果的基础上,用有限元法对采场围岩和充填体的应力分布状况进行了研究,按充填料浆三种不同力学性质状态对充填挡墙进行了受力分析和计算,研究表明:充填挡墙设置地点、分次充填高度、充填料内摩擦角、充填体的粘结力等是影响采场全尾砂充填挡墙力学特性的主要因素。结合冬瓜山铜矿床首采地段充填采场的实际情况提出的8#大孔采矿采场充填挡墙实施方案技术可靠,具有实施的可行性。The stress distribution of surrounding rock and filling body in stope were studied by using finite element method on the basis of test results in laboratory.According to three different mechanical property states of filling slurry,the force of filling retaining wall was analysed and calculated.The research result showed that the location of filing retaining wall,stage filling height,internal friction angle of filling material,binding force of filling body,etc.were the main factors of influencing the mechanical property of whole tailing filling retaining wall in stope.Combined with the practical situation of filling stope in initial mining section of Dongguashan copper deposit,the implementation scheme for filling retaining wall in 8 # large hole mining stope were put forward,and it is reliable and feasible.
分 类 号:TD853.34[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.124