地铁望京东站墙体模板施工技术  被引量:3

CONSTRUCTION TECHNIQUE OF WALL FORMWORK AT WANGJING EAST SUBWAY STATION

在线阅读下载全文

作  者:张丽丽[1] 王奎岩 潘天华[2] 

机构地区:[1]北京工业职业技术学院,北京100042 [2]北京建工集团有限责任公司,北京100055

出  处:《建筑技术》2011年第8期700-703,共4页Architecture Technology

摘  要:目前北京处于地铁建设高峰期,新工艺、新技术不断出现,常规地铁站施工由于受环境约束,均采用围护桩护壁,墙体采用单侧支模施工工艺。而地铁望京东站墙体模板施工中,采用了有地铁特色的双侧墙体模板体系,为明挖地铁车站大放坡开挖工法提供了后续保障,为其他高、厚墙体模板施工提供了参考依据。At present, Beijing is witnessing a roaring subway construction period, and many new processes and techniques are developed. Due to the environmental limitation, routine subway station construction uses guard piles for wall protection and wails use unilateral supporting formwork. In the construction of wall formwork at Wangjing East Subway Station, bilateral wall formwork system with subway characteristics is adopted to provide protection for the open excavation of subway station large slope, and also to provide reference basis for the construction of other high and thick wail formworks.

关 键 词:地铁车站 墙体施工 双侧模板体系 

分 类 号:TU755.2[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象