高速公路填石路基试验段施工质量控制  被引量:8

Quality Control of Construction of Freeway Rock-fill Roadbed Test Section

在线阅读下载全文

作  者:隋玉凤[1] 

机构地区:[1]湖北三峡职业技术学院,宜昌443000

出  处:《价值工程》2011年第24期82-82,共1页Value Engineering

摘  要:通过对宜长高速公路工程第三合同段填石路基铺层厚度、填料的最大粒径、压实机具及其施工工艺等影响压实效果的因素进行现场试验和综合分析,提出了填石路基的施工工艺,确定了压实机具选型、质量控制的指标与方法;通过对专用压路机的设计研究和性能试验,验证了填石路基专用设备对其压实的有效性和可行性,通过试验段填筑施工为日后大规模施工提供了有效技术条件。Factors,such as rock-fill roadbed ply thickness,the maximum size of filler,compaction equipment and construction technology of the third contract section of Yichnag to Changyang freeway engineering,affecting the compaction effect were tested and analyzed,and the construction technology of rock-fill roadbed was proposed,lectotype of compaction equipment and indicators and methods of quality control were confirmed.Effectiveness and feasibility of rock-fill roadbed special equipment to its compaction was verified through design research and performance test to special roller,which provided effective technical conditions for future large-scale construction through test section filling.

关 键 词:填石路基 施工工艺 碾压遍数 质量控制 

分 类 号:U416[交通运输工程—道路与铁道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象