检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]宁波大学建筑工程与环境学院,浙江宁波315211 [2]北京安捷工程咨询有限公司,北京100037
出 处:《工业建筑》2011年第8期121-125,共5页Industrial Construction
基 金:宁波市重大科研攻关项目资助(2009C50004);宁波市自然科学基金项目资助(2010A610081)
摘 要:竖井施工不可避免扰动地层,引起地铁隧道周边建筑物沉降,影响其安全和正常使用。结合某地铁区间隧道,分析竖井施工引起的周边建筑物的变形特点、原因及规律。以邻近某建筑为例,提出开挖掌子面进行全断面封闭措施;隧道内超前深孔帷幕注浆;隧道台阶法开挖及时进行支护,并向初期支护背后注浆回填、径向注浆以及地面注浆加固技术措施,对建筑物施工后沉降进行控制,达到了预期效果。Construction of shaft in metro tunnel will inevitably bring ground disturbance and cause settlement of adjacent buildings,then the safety and the normal use of buildings is affected.Based on the practice of a certain metro running tunnel,the deformation character,reason and movement law of the around buildings induced by shaft construction are analyzed in this paper.Thereafter,taking a dormitory building for example,the measures of full-section sealing in tunnel face,such as advanced deep-hole curtain grouting,bench excavation and timely supporting associated with backfill grouting,radius grouting and ground surface grouting,are proposed to reinforce and control the deformation of buildings.
分 类 号:U455.8[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.40