国际工程承包项目失败因素的三角模糊数分析  被引量:1

Analysis on Contract of International Engineering Project by Triangular Fuzzy Numbers

在线阅读下载全文

作  者:陆宁[1] 朴越[1] 赵敏[1] 段蕾[1] 杨锦[1] 

机构地区:[1]长安大学建筑工程学院,西安710061

出  处:《价值工程》2011年第25期63-64,共2页Value Engineering

基  金:青海省自然科学基础研究计划资助项目(编号:2008-Z-601)

摘  要:本文分析了影响国际承包项目失败的因素并建立了相应的指标评价体系,介绍了运用三角模糊数互反判断矩阵[3]确定因素权重的方法。结合实例描述了此方法在确定国际承包项目失败因素权重上的应用,进而明确主要失败原因,不断认识项目在承包过程中出现的问题,使我国建筑企业在国际承包领域不断进步。This article analyses the reason of failing in the contract of international engineering project and establishes the system which can evaluate the index. We apply the method of triangular fuzzy number reciprocal judgment matrices to determine the weight of failure factors .We describe the method on how to ensure the weight of failure factors of international engineering project, then, we can know the problem in the contract of international engineering project and let our enterprises of construction make progress on the field of contract of international engineering.

关 键 词:国际承包项目 失败因素 三角模糊数 

分 类 号:TU723.2[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象