斜井在长输管道黄土塬冲沟地段施工中的应用  被引量:1

Application of inclined shaft in the construction at long-distance pipeline soil gulch section

在线阅读下载全文

作  者:刘欣[1] 张存存[1] 赵栋超[1] 

机构地区:[1]河南省濮阳市中原油田建设集团公司

出  处:《山西建筑》2011年第26期105-106,共2页Shanxi Architecture

摘  要:以"榆林—济南输气管道工程线路八标段冲沟施工"为例,重点介绍了长输管道在黄土塬冲沟地段的穿越施工经验,通过斜井辅助施工,大大降低了难度和成本,从而确保工程质量、缩短工期、降低施工风险,是一种值得推广应用的施工技术。Taking the gulch construction at No. 8 standard section on Yulin-Ji' nan natural gas pipeline engineering as the example, it mainly introduces the experience of crossing construction at long-distance pipeline soil gulch section. Through inclined shaft auxiliary construction, it greatly reduces difficult degree and cost. As a result, it guarantees the project quality, shortens construction duration, and reduces construction risks. Therefore,it is kind of construction technology which is worth promoting.

关 键 词:长输管道 斜井 冲沟 施工工法 

分 类 号:U175[交通运输工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象