机构地区:[1]华北水利水电学院,河南郑州450011 [2]郑州市水利建筑勘测设计院,河南郑州450007
出 处:《人民黄河》2011年第8期118-119,共2页Yellow River
摘 要:采用三维有限元方法,在不同荷载组合下,计算分析了预应力边墩在不对称荷载作用下闸墩颈部、锚块等关键部位的应力分布规律。结果显示:施加预应力可以解决承受大吨位弧门推力边墩的高拉应力状态;锚块受力基本合理,只在空腔前后出现较大拉应力,应根据结构受力状态进行配筋;闸墩的高拉应力区主要分布于闸墩颈部,但拉应力较小,能够满足预应力混凝土结构对拉应力的要求,闸墩结构安全。Based on three-dimensional finite element method,under the different load combination,the prestressed abutment pier in the asymmetric loading pier neck,anchor block,and other key parts of the stress distribution were studied.The results show that the prestressing force could solve the state of high tensile stress of the abutment pier supporting large tonnage radial gate thrust,anchor block stress is basically reasonable.A larger tensile stress only appears in the cavity of it so that the reinforceing bars should be based on the stress state of structure.The high tensile stress zones mainly distribute in the pier neck,but the tensile stress is small,which can meet the demand of the prestressed concrete construction to the tensile stress,so the structure of the pier is safe.
关 键 词:预应力闸墩 三维有限元 应力分析 泄洪排沙闸 抽水蓄能电站
分 类 号:TV662[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3