有底柱充填法在琅琊山铜矿的应用  

Application of filling stoping with bottom pillar in Langyashan Copper Mine

在线阅读下载全文

作  者:王德洲[1] 

机构地区:[1]安徽省琅琊山矿业总公司,安徽滁州239000

出  处:《化工矿物与加工》2011年第9期28-30,共3页Industrial Minerals & Processing

摘  要:为了提高生产效率,琅琊山铜矿将原有的无底柱上向分层充填采矿工艺改为有底柱上向分层充填采矿工艺,与原有的充填开采工艺比较,改进后的充填采矿工艺避免了在矿块前期拉底及后期顶柱回采时的大量投入,提高了回采效率,取得了较好的经济及社会效益,为此类矿体的高效回采提供了借鉴经验。To improving operation efficacy, the original operation process, upward slicing and filling stoping without pillar, has been improved instead of by upward slicing and filling stoping with bottom pillar in Langyushan Copper Mine. The improved operation process avoids a large number of engineering required for undercutting during formation of ore block in prophase, and mining pillar in later stage, improving mining efficacy, getting better economy and social benefits, which provides a reference to other mine with similar conditions.

关 键 词:有底柱上向分层充填采矿法 底柱回采 顶柱回采 胶结充填 

分 类 号:TD853.34[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象