检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李龙福[1] 金爱兵[1] 邓富根[1] 刘波[1]
机构地区:[1]北京科技大学土木与环境工程学院,北京100083
出 处:《中国矿业》2011年第9期84-86,91,共4页China Mining Magazine
摘 要:本研究以北洺河铁矿为工程背景,针对采准切割工作中出现的软岩交叉巷道,运用FLAC3D对联巷交叉口进行三维数值模拟分析,研究交叉口围岩的力学、位移和变形破坏演化规律,并将控制点的位移监测值与计算值进行对比分析。研究结果表明:数值模拟方法必须辅以现场监控量测,才能客观正确地反映出地下工程在施工过程中围岩应力、位移及塑性区分布等特征,并为施工设计提供有效的参考依据。There are many intersections in preparatory workings of soft rock tunnel at Beiminghe Iron Mine, 3D numerical simulation analysis of the intersection between link roadways based on software FLAC3D , in which the mechanics of wall rock & displacement & deformational and destructive law are studied, and compared the results between simulation monitoring & practicality monitoring of control points. The results show that the numerical simulation methods must be supplemented by monitoring measurement on-the-spot, so as to reflect the distribution and other features of rock stress &displacement& plastic zones objectively and correctly in the process of underground engineering, and providing effective ref- erence for construction design.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.143