检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:赵福强[1] 顾宇[1] 易朝晖[1] 高文英[1] 于涛[1]
出 处:《热力透平》2011年第3期203-206,211,共5页Thermal Turbine
摘 要:蒸汽输送管道疏水系统对核电机组运行的经济性和安全性起着至关重要的作用,本文针对大型压水堆核电机组饱和蒸汽管道,建立饱和蒸汽输送管道疏水量计算的数学模型,以国内某引进型大型压水堆核电机组为例,计算出主要蒸汽管道的启动疏水量和经常疏水量,结果表明核电机组蒸汽输送管道经常疏水量不可忽略,须同时针对启动疏水和经常疏水拟定疏水系统。The steam line drain system plays an important role in the economy and safety of the nuclear power unit.In view of the saturated steam line of the nuclear power plant,this paper sets up a mathematical model to calculate the saturated steam line drain flowrate,then an imported PWR nuclear power unit is taken as an example to calculate the startup and regular drain flowrate by using the model.The calculation result indicates that the regular drain flowrate of the saturated steam line cannot be ignored and the drain system should be designed based on start-up drain and normal drain.
分 类 号:TM623.91[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28