检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]汕头港华兴工程建设监理所,广东汕头515041 [2]汕头港务集团,广东汕头515041
出 处:《港工技术》2011年第4期38-39,共2页Port Engineering Technology
摘 要:在汕头港广澳港区临时避风塘工程的施工中,以高压水泥旋喷桩作为防水帷幕,实现了基槽、港池挖方的陆上干地施工。以本工程为例,重点介绍高压水泥旋喷桩的施工要点、主要施工技术措施的可行性和经济性,可供类似工程参考。In the temporary typhoon shelter project of Shantou Port Guangao Harbor Area, high pressure jet grouting pile is used as waterproof curtain, and the foundation trench and harbor basin are excavated on land. The above project is used as an example to emphasize key points of high pressure jet grouting pile construction, as well as the feasibility and economy of major technical measures adopted in construction, which will provide the reference for similar projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49