以设计为核心的EPC模式是我国工程企业国际化发展的必由之路——浅谈巴基斯坦卡西姆港国际集装箱码头工程的建设经验  

EPC Mode with Core of Design Is Only Way to Internationalize Chinese Engineering Enterprises Construction Experience on Qasim International Container Terminal Project in Pakistan

在线阅读下载全文

作  者:王福强[1] 王玉平[1] 杨晓婷[1] 

机构地区:[1]中交第四航务工程勘察设计院有限公司,广东广州510230

出  处:《港工技术》2011年第4期40-42,共3页Port Engineering Technology

摘  要:以巴基斯坦卡西姆港集装箱码头工程为例,介绍该项目从竞投标、准备到实施阶段的主要工作内容,重点分析"以设计为核心,兼顾施工条件和采购渠道"的EPC模式的优势,总结以设计为核心的EPC模式在该项目建设中取得的经验,为我国工程企业境外总承包工程提供参考。Pakistan Qasim International Container Terminal Project is used as an example to introduce major work in three stages of tendering and bidding, project preparation and implementation; analyze the advantages of EPC mode in which design is the core, and attention is given to construction condition and procurement channel; summarize successful experience of EPC mode with the core of design in Qasim International Container Terminal Project, which will provide the reference for Chinese engineering enterprises contracting overseas EPC project.

关 键 词:巴基斯坦 集装箱码头 设计 EPC 核心 

分 类 号:U655[交通运输工程—港口、海岸及近海工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象