检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《黄金》2011年第9期32-35,共4页Gold
摘 要:冬瓜山铜矿大团山矿床开采设计生产能力为1 800 t/d,其中-580 m中段开采系统于2006年底投产。经过几年开采,-580 m以上开采的资源逐渐枯竭,为了保证矿山生产衔接,实现大团山矿床安全、高效开采,对大团山矿床-580 m以下矿体采矿方法的科学、合理选择显得尤为重要。在分析大团山矿床开采技术条件及开采实践经验基础上,对大团山-580 m以下矿床开采提出了大直径深孔和中深孔落矿的阶段空场嗣后充填采矿法,详述了盘区划分、回采工艺以及开采时应注意的安全措施。The design mining capacity of Datuanshan deposit is 1 800 t/d and the - 580 m middle section mining system put into production in 2006. After several years mining, the resources above -580 m middle section face exhaustion. In order to ensure the safe and high-efficient mining of the deposit, it is important to choose scientific and rational mining method for the orebody bellow -580 m middle section. Based on the analysis on the mining conditions and experiences in the deposit, the large-diameter length hole, medium-length hole ore blasting-stage open stope subsequent filling method is chosen. The panel partition, mining technique and safety measures are introduced.
关 键 词:大团山矿床 大盘区 中 深孔落矿 阶段空场 嗣后充填
分 类 号:TD853.32[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229