检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:董良峰[1]
机构地区:[1]南京工程学院建筑工程学院,江苏南京211167
出 处:《施工技术(下半月)》2011年第8期81-84,共4页Construction Technology
摘 要:在施工合同的履行过程中,由于工程各方目标的不同和项目管理水平的差异,工程争议不可避免。而争议的解决将消耗各方的资金、时间及各种资源。如何将这种消耗降到最低,是项目管理人员应该思考的问题。对国内外建设工程争议评审制度现状进行研究,从交易成本的理论出发,对我国正在尝试实施的建设工程争议评审制度进行研究,并在此基础上提出完善措施。In the performance of construction contract,because of different targets and management standards,the disputes are unavoidable.These disputes solution will consume some kinds of resources such as time and money,etc.How to make the consumption reduced to the lowest level is a question to project managers.The status of dispute settlement mechanism for construction projects at home and abroad are introduced.Based on the theory of transaction cost,the dispute settlement mechanism for construction projects which is trying in China is researched,and the corresponding measures to improve the rules are put forward.
分 类 号:TU712[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3