Rational cutting height for large cutting height fully mechanized top-coal caving  被引量:7

Rational cutting height for large cutting height fully mechanized top-coal caving

在线阅读下载全文

作  者:Huang Bingxiang Li Hongtao Liu Changyou Xing Shijun Xue Weichao 

机构地区:[1]School of Mines, China University of Mining & Technology, Xuzhou 221116, China [2]College of Safety Engineering, North China University of Science and Technology, Beijing 101601, China [3]Xinglongzhuang Coal Mine, Yankuang Coal Croup. Zoucheng 273500, China

出  处:《Mining Science and Technology》2011年第3期457-462,共6页矿业科学技术(英文版)

基  金:Financial support for this work, provided by the National Basic Research Program of China (No.2007CB209400);the National Natural Science Foundation of China (No.51004104)

摘  要:Large cutting height fully mechanized top-coal caving is a new mining method that improves recovery ratio and single-pass production. It also allows safe and efficient mining. A rational cutting height is one key parameter of this technique. Numerical simulation and a granular-media model experiment were used to analyze the effect of cutting height on the rock pressure of a fully mechanized top-coal caving work face. The recovery ratio was also studied. As the cutting height increases the top-coal thickness is reduced. Changing the ratio of cutting to drawing height intensifies the face pressure and the top-coal shattering. A maximum cutting height exists under a given set of conditions due to issues with surrounding rock-mass control. An increase in cutting height makes the top-coal cave better and the recovery ratio when drawing top-coal is then improved. A method of adjusting the face rock pressure is presented. Changing the cutting to drawing height ratio is the technique used to control face rock pressure. The recovery ratio when cutting coal exceeds that when caving top-coal so the face recovery ratio may be improved by over sizing the cutting height and increasing the top-coal drawing ratio. An optimum ratio of cutting to drawing height exists that maximizes the face recovery ratio. A rational cutting height is determined by comprehensively considering the surrounding rock-mass control and the recovery ratio. At the same time increasing the cutting height can improve single pass mining during fully mechanized top-coal caving.Large cutting height fully mechanized top-coal caving is a new mining method that improves recovery ratio and single-pass production. It also allows safe and efficient mining. A rational cutting height is one key parameter of this technique. Numerical simulation and a granular-media model experiment were used to analyze the effect of cutting height on the rock pressure of a fully mechanized top-coal caving work face. The recovery ratio was also studied. As the cutting height increases the top-coal thickness is reduced. Changing the ratio of cutting to drawing height intensifies the face pressure and the top-coal shattering. A maximum cutting height exists under a given set of conditions due to issues with surround- ing rock-mass control. An increase in cutting height makes the top-coal cave better and the recovery ratio when drawing top-coal is then improved. A method of adjusting the face rock pressure is presented. Changing the cutting to drawing height ratio is the technique used to control face rock pressure. The recovery ratio when cutting coal exceeds that when caving top-coal so the face recovery ratio may be improved by over sizing the cutting height and increasing the top-coal drawing ratio. An optimum ratio of cutting to drawing height exists that maximizes the face recovery ratio. A rational cutting height is determined by comprehensively considering the surrounding rock-mass control and the recovery ratio. At the same time increasing the cutting height can improve single pass mining during fully mechanized top-coal caving.

关 键 词:Large cutting height fully mechanizedmining with sublevel caving Cutting heightThe ratio of cutting height to drawing heightGround pressureRecovery ratio 

分 类 号:TD823.97[矿业工程—煤矿开采] TG48[矿业工程—矿山开采]

 