检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]上海大学机电工程与自动化学院,上海200072
出 处:《电力系统保护与控制》2011年第19期17-23,29,共8页Power System Protection and Control
摘 要:构建了一种长期电力市场的理论计算模型,该模型继承于电力系统随机生产模型,考虑了机组的强迫停运以及负荷随时间的波动变化。在此基础上,考虑了机组报价的不确定性,并将其归结为离散的随机变量。按照市场统一出清的规则,提出了一种以等效机组代替机组容量块的求解算法,并给出了数学证明以及计算量估计。给出了基于IEEERTS数据的计算结果,通过与MonteCarlo算法的比较证实了该算法的正确性。In this paper, a long-term electricity market simulation model is developed. This model inherits from the model of probabilistic power system simulation and takes the forced outage of the generating units and the fluctuation of load into consideration. On this basis, the stochastic bidding of the generating units is also researched. The stochastic bidding is described as discrete stochastic variable. According to the market clearing rule, an algorithm is given, in which the capacity blocks of the units are replaced by the equivalent units, to calculate the expected production energy of generating units, the reliability index (LOLP, EUE), and the probability distribution of marginal price. Using the equivalent units, the algorithm has light computation burden. Finally, the IEEE RTS is applied to the case study, and the result is given. A comparison of the proposed algorithm and the Monte Carlo method shows the correctness of the presented algorithm.
关 键 词:长期电力市场仿真 电力系统随机生产模拟 边际电价
分 类 号:TM743[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.79