某水电站长发电引水系统设计和优化  

Design and Optimization of the Long Diversion System for a Hydropower Station

在线阅读下载全文

作  者:潘旭东[1] 杨照明[1] 郭宇[1] 

机构地区:[1]新疆水利水电勘测设计研究院,新疆乌鲁木齐830000

出  处:《水力发电》2011年第9期32-34,共3页Water Power

摘  要:根据新疆某水电站发电引水系统的地形、地质条件,对发电引水洞Ⅱ类及ⅢA类(Ⅲ类偏好)围岩洞段取消常规的钢筋混凝土全断面衬砌,采用喷锚支护作为永久衬砌,缩短了发电洞的施工工期;参考以往工程经验,上游调压室取消了检修门,既可保证电站的安全运行又可减少工程投资。这些设计优化,可供类似的长发电引水洞工程参考。According to the topographical and geological conditions of a hydropower station in Xinjiang, the sections of diversion tunnel with Class II or IIIa surrounding rock are designed to be lined with shotcrete and anchor rod as a permanent lining instead of conventional reinforced concrete full-face lining. The lining optimization shortens the construction period. Based on existing engineering experiences, the service gate for the upstream surge chamber is cancelled, which can not only guarantee the safe operation of power plant, but also reduces the engineering investment. The design optimization can be as references for similar diversion tunnel.

关 键 词:发电引水洞 衬砌 喷护 调压室 优化设计 

分 类 号:TV554.14[水利工程—水利水电工程] TV554.12

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象