检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]天津市地下铁道集团有限公司,天津300051
出 处:《铁路工程造价管理》2011年第5期22-23,26,共3页Railway Engineering Cost Management
摘 要:城市轨道交通工程建成投入运营后,节能运营就成为运行、维护和管理的重点。因此,在设计阶段就应考虑线路纵断面设计对今后节能运营的影响。此文在以工程造价最低线路纵断面设计的基础上,论述节能运营的线路纵断面二次优化设计,把列车运行能耗作为目标函数,对纵断面内的变坡点在约束范围内进行必要的的调整,使运营能耗极小化,达到节能的目的。After putting into operation of urban rail traffic engineering, saving energy operation will be the keys of running, maintenance and management. Therefore, the longitudinal section design's influence on energy - saving operation in design stage should be considered. On the basis of the longitudinal section design for project cost minimum line, energy - saving operation of longitudinal line second optimization design is discussed. Viewing the train operation consumption as the objective function, the point of change slope in longitudinal section is adjusted within constraints to minimize the operation assumption and achieve the goal of energy saving.
分 类 号:U231.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.90