检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:舒森[1]
机构地区:[1]中国中铁二院工程集团有限责任公司,四川成都610031
出 处:《物探与化探》2011年第5期710-714,共5页Geophysical and Geochemical Exploration
摘 要:为了减少地质灾害对隧道施工的影响,采用TSP203超前地质预报系统对隧道掌子面前方进行探测,提供超前地质预报,为后续施工提供指导。但是,在实际应用中出现了很多误报、漏报或者准确性太低的情况,这些问题往往是由于数据采集和数据处理中的不足带来的。通过规范的数据采集和合理的数据处理,可以减少这些不足的不良影响,从而提高TSP203系统在超前地质预报应用中的准确性。The transport engineering has massive tunnel construction, and the tunnel construction is likely to be affected by adverse geological structures. In order to reduce the influence of geological disaster on tunnel construction, researchers use the TSP203 geological forecast system to carry out the survey in front of the tunnel face and provide in advance geological prediction that could give instructions for the following construction ; nevertheless, due to the existence of much misinformation in the practical application, these means often fail to report the situation or the accurate of the report is too low. These problems often result from the insufficient data acquisition and data processing. Through standard data acquisition and reasonable data processing, the adverse effect might be reduced, and the application accuracy of the TSP203 system in the geological forecast could be improved.
关 键 词:TSP203超前地质预报系统 数据采集 数据处理 准确性
分 类 号:P631.4[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222