检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江苏省疾病预防控制中心,江苏南京210009
出 处:《中国职业医学》2011年第5期397-400,共4页China Occupational Medicine
摘 要:目的了解类比法在建设项目职业病危害预评价中的应用现况及优缺点。方法采用德尔菲专家咨询法形成的类比评价指标体系编制调查表,调查29个建设项目预评价中类比法的应用情况。结果评价指标体系的50个指标中,有19个指标应用率超过50%,21个指标应用率超过25%;选择不同的类比项目和类比数据对类比评价综合指数的影响差异有统计学意义(P<0.05);同一项目类比调查和控制效果评价的职业病危害因素识别数、职业病危害因素检测种类之间有相关性(P<0.01),类比综合指数大于0.75的组类比调查检测合格率和控评检测合格率之间有相关性(r=0.911,P<0.01)。结论类比法适用于改扩建、技术改造的建设项目,类比项目综合指数高的类比调查对拟建项目的预测性较好。Objective To investigate the current situation, advantages and disadvantages of analogy in pre-assessment of occupational hazards. Methods 29 construction projects were surveyed with the questionnaire based on the assessment index system of analogy formed by the improved Delphi method. Results Of 50 indexes in assessment index system, 19 indexes were used as much as more than 50% and 21 indexes more than 25%. There were significant differences when choosing different analogy items or analog data ( P 〈 0.05 ). The occupational hazard factors correlated with the monitoring categories when pre-assessed and effect-assessed the same construction project ( P 〈 0.01 ). Correlations were found between the qualified rate of pre-assessment, which comprehensive index was 〉0. 75, and the qualified rate of effect assessment (r =0. 911, P 〈0. 01 ). Conclusion The analogy method was suitable for the assessment of project extension and technical reconstruction. The high comprehensive index of analogy is helpful to assess the effect of the project.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117