检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]安徽省电力科学研究院,合肥市230601 [2]东南大学土木工程学院,南京市210096
出 处:《电力建设》2011年第10期54-57,共4页Electric Power Construction
摘 要:基于2E2-SZ2型220kV输电塔结构的三维空间分析模型,考虑结构节点间的风速时程相关性,采用线性滤波法中的自回归(autoregressive,AR)模型,利用Matlab与Visual C++的混合编程技术,编制了高压输电塔结构的空间三维风速时程模拟程序。通过算例分析证明了其准确性和有效性,可为输电塔线的风振响应分析提供参考。In this paper, a 3D space analyzing model is built for the structure of 220 kV 2E2-SZ2 transmission tower. The wind speed time-histories relativity between the nodes of the structure is considered, the autoregressive (AR) model is adopted. Under the application of Matlab and Visual C++ mix- programming technique, a 3D wind speed time-histories simulation program of high-voltage transmission tower is developed. The calculation sample shows that the model is accuracy and effective. The model can be referenced in the future analysis of wind-vibration response for the transmission lines.
分 类 号:TM75[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229