检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:申海生
机构地区:[1]潞安环能股份公司常村煤矿,山西长治046102
出 处:《煤》2011年第9期13-15,共3页Coal
摘 要:针对潞安常村煤矿S6 1号回风上山处于地应力异常区域及围岩具有蠕变性等特点进行分析,提出对初始支护段进行套棚加固,新掘段采用全长预应力锚固强力锚杆锚索组合支护系统进行支护,并进行了现场应用及矿压监测。监测表明,巷帮变形量较小,锚杆锚索受力稳定,说明支护有效控制了围岩变形,支护效果非常明显。According to LuAn ChangCun coal mine S61 number return air up the mountain in regional and surrounding rock stress a- nomalies have degeneration of creep characteristics analysis, some sections of the initial support of reinforcement, dig new tents for the prestressing anchor bolt anchor cable length powerful combination supporting system of support, and the field application and mine pressure monitoring. Monitoring, lane that help deformation, smaller bolt anchor cable force stable, effective control of the support that surrounding rockmass deformation, supporting the effect is very apparent.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.143.144.95